Multi-Project Dashboard

Overview of all calculations and running totals

Total Project Value
£0.00
Total Concrete (m³)
0.00
Total Pipe Length (m)
0.00
BOQ Line Items
0
💡 Quick Start Guide:
1. Select a calculation module from the sidebar
2. Enter your measurements and specifications
3. Review auto-calculated results
4. Everything auto-saves to BOQ Master
5. Export final PDF when ready

UK Drainage Auto-Calculator

Complete drainage system with UK standard bedding classes

N
No Bedding
F
Flexible 100mm
S
Selected 150mm
B
Bedded 100mm+300mm
A
Arch 180° Support
📊 Drainage Results
Bedding Volume
0.00
Pipe Length (w/ wastage)
0.00m
Excavation Volume
0.00
Bedding Class
F

Manhole Schedule Generator

Auto-calculate manhole rings and components

🔄 Auto Ring Optimization: The system automatically selects the best combination of 1000mm, 750mm, 500mm, and 250mm rings to minimize the total number of rings required.
🔲 Manhole Components
Number of Rings
0nr
Ring Height Available
0.00m
Concrete Surround
0.00
Cover Slab
0.00
Step Irons
0nr
Cover & Frame
1nr
📐 Manhole Depth Breakdown:

Duct Bank Calculator

Calculate sand bedding, backfill, excavation and duct requirements

📏 Duct Bank Configuration:
• Sand bedding beneath ducts (typically 150mm)
• Spacing between ducts (typically 100mm)
• Sand surround above ducts (typically 150mm)
• Backfill from top of sand to ground level
🔌 Duct Bank Results
Total Ducts
0nr
Total Duct Length
0.00m
Sand Bedding
0.00
Sand Surround
0.00
Total Sand Required
0.00
Backfill Volume
0.00
Total Excavation
0.00
Duct Bank Width
0.00m
Duct Bank Height
0.00m
📐 Duct Bank Breakdown:

Rebar Calculator

Calculate reinforcement quantities and weights

🔩 Rebar Results
Total Length
0.00m
Total Weight
0.00kg
Number of Bars
0nr
Weight per Metre
0.00kg/m

Kerb Calculator

Calculate kerbs, concrete foundation, and backing material

📏 UK Standard Kerb Types:
• HB2 (Half Battered): 125mm × 255mm - Most common for roads
• HB1 (Half Battered): 150mm × 305mm - Heavy duty roads
• BN (Bullnose): 150mm × 305mm - Pedestrian/decorative areas
• Flat Top: 125mm × 150mm - Light duty/industrial
🛣️ Kerb Results
Kerbs Required
0nr
Foundation Concrete
0.00
Backing Concrete
0.00
Total Concrete
0.00
Foundation per metre
0.00m³/m
Backing per metre
0.00m³/m
📐 Kerb Installation Breakdown:

Shuttering & Formwork Calculator

Comprehensive plywood, timber, fixings, props and accessories calculator

🏗️ What are you building?

Select your formwork type and we'll set up the calculator with the right defaults

📐 UK Formwork Standards:
Plywood: Marine ply (exterior grade) or phenolic shutterply for concrete formwork
Walings: Horizontal timber supports (typically 100×50mm at 600mm centres)
Soldiers: Vertical timber supports (typically 100×50mm at 450mm centres)
Props: Acrow props support slabs (1.2m grid) or walls (1.5-2m spacing)
Ties: Through-ties or snap ties to hold formwork together (600mm grid)
Release Agent: Oil or proprietary release agent for easy stripping

Props Calculation:
Slabs/Soffit: Props in grid pattern (Length ÷ Spacing) × (Width ÷ Spacing)
Walls: Props at spacing intervals along length to support walings
Columns: Minimum 4 props at corners, more for larger perimeters
Wall length or slab length
Wall height or slab width
Auto-set based on type (walls=1/2, columns=4)
📐 Shuttering Material Requirements
Plywood Sheets
0nr
Total Ply Area
0.00
Waling Timber
0.00m
Soldier Timber
0.00m
Total Nails
0nr
Nails Weight
0.00kg
Total Screws
0nr
Total Staples
0nr
Form Ties
0nr
Props Required
0nr
Release Agent
0L
Kicker Timber
0.00m
📋 Materials Breakdown:

Kerb Calculator

Calculate concrete bedding, backing, and kerb unit requirements

📏 UK Kerb Standards:
Bedding: Concrete foundation beneath the kerb (typically 100mm deep × 300mm wide)
Backing (Haunch): Concrete support behind the kerb to prevent tipping (typically 150mm × 150mm)
Standard Length: 915mm (3ft) is most common, with shorter units for curves
🛣️ Kerb Results
Kerb Units Required
0nr
Bedding Concrete
0.00
Backing Concrete
0.00
Total Concrete
0.00
Bedding per Metre
0.000m³/m
Backing per Metre
0.000m³/m

Kerb Calculator

Calculate kerbs, concrete foundation, and backing per metre

📏 Kerb Dimensions:
• Standard Kerb Length: 915mm (0.915m)
• Dropped Crossing: 780mm (0.780m)
• Foundation: Typically 300mm wide × 150mm deep
• Backing: Typically 150mm wide × 150mm high behind kerb
🛣️ Kerb Results
Number of Kerbs
0nr
Foundation Concrete
0.00
Backing Concrete
0.00
Concrete per Metre
0.00m³/m
Total Concrete
0.00
Linear Metres
0.00m

Tarmac Build-up Calculator

UK DOT standard road construction - Type 1, Binder & Surface courses

🛣️ UK Tarmac Standards (BS 594987:2024):
Sub-Base: DOT Type 1 (150-225mm) - well compacted foundation
Binder Course: AC20 bin (45-105mm) - structural strength layer
Surface Course: AC6/AC10 surf (20-40mm) - wearing layer
Materials: SMA (high traffic), HRA (durability), AC (general use)
🚗 Tarmac Build-up Results
Total Area
0.00
DOT Type 1 Sub-base
0.00
Base Course AC32
0.00
Base (tonnes)
0.00t
Binder Course AC20
0.00
Binder (tonnes)
0.00t
Surface Course AC6/10
0.00
Surface (tonnes)
0.00t
Total Build-up Depth
0mm
Total Tarmac
0.00t
Excavation Volume
0.00
📐 Build-up Specification:
⚠️ Note: For Tarmac ULTICOLOUR or SMA surfaces, consult specialist suppliers. Standard densities: AC = 2.4 t/m³, SMA = 2.5 t/m³, HRA = 2.45 t/m³

Surface Area & Volume Calculator

Calculate areas and volumes for various shapes and applications

📏 Common Applications:
• Concrete slabs, footings, and foundations
• Wall rendering and plastering
• Paint coverage and decorating
• Material quantities for floors, walls, and roofs
📏 Surface & Volume Results
Surface Area
0.00
Perimeter/Length
0.00m
Volume
0.00
With Wastage
0.00
Concrete (tonnes)
0.00t
Paint Coverage (2 coats)
0.00L
📐 Calculation Details:

Aggregates & Fill Materials Calculator

Calculate quantities for Type 1, MOT, Sand, Gravel, and specialist aggregates

🪨 Material Categories:
Type 1/MOT: Sub-base for roads, blocks, hard core (limestone, crushed concrete, granite)
Sand: Sharp, building, washed recycled, reject sand for various applications
Gravel: Decorative and functional - 6mm to 40mm sizes
Topsoil: Horticultural, enriched, mulch, premium, turfing soil
Ballast: Concreting, sub-base, driveways - 0-10mm to screened types
Specialist: 6F2, Type 3, tarmac plainings, gabion fill, granite dust
🪨 Aggregate Requirements
Total Area
0.00
Base Volume
0.00
With Wastage
0.00
With Compaction
0.00
Weight (tonnes)
0.00t
Bulk Bags (850kg)
0bags
Small Bags (25kg)
0bags
Material Density
0.00t/m³
📐 Material Information:
📊 Calculation Breakdown:

Paving & Natural Stone Calculator

Calculate quantities for slabs, porcelain, natural stone, and paving sets

🟫 Paving Types:
Concrete Slabs: Standard paving slabs in various sizes
Porcelain Paving: Premium porcelain tiles for outdoor use
Natural Stone: Indian Sandstone, Limestone, Granite, Slate
Paving Sets: Setts, cobbles, block paving
🟫 Paving Requirements
Total Area
0.00
Units Required
0nr
With Wastage
0nr
Packs Required
0packs
Coverage per Pack
0.00
Weight (approx)
0.00kg
Jointing Sand
0.00kg
Adhesive Required
0.00kg
📐 Paving Specification:
📊 Installation Notes:

Pricing Library

Manage unit rates for automatic BOQ pricing

Concrete C25/30 (m³)
Pipe 150mm (m)
Pipe 225mm (m)
Bedding Material (m³)
Sand (m³)
Backfill Material (m³)
Excavation (m³)
Electric Duct (m)
Duct 110mm (m)
Rebar H12 (tonne)
Plywood 18mm (sheet)
Timber 100x50 (m)
Nails (kg)
Wood Screws (per 100)
Staples (per 1000)
Form Ties (nr)
Acrow Props (nr/day)
Release Agent (L)
Manhole Ring 1050mm (nr)
Manhole Cover & Frame (nr)
Kerb Unit (nr)
DOT Type 1 Sub-base (m³)
AC32 Base Course (tonne)
AC20 Binder Course (tonne)
AC6/AC10 Surface (tonne)
Aggregates/Fill (m³)
Paving/Stone (per unit)
💡 Pricing Library: These rates auto-apply to BOQ calculations. Update them to match your local suppliers or current market rates. All prices are in GBP (£).

BOQ Master

Complete Bill of Quantities with running totals

Total Value
£0.00
Line Items
0
Item Description Quantity Unit Rate (£) Amount (£) Action
No items yet. Add calculations from any module to build your BOQ.
TOTAL £0.00